A contractor has been given instructions to perform M&V with more intensity and vigor.
What factor will not affect the M&V accuracy and cost?
A: Availability of existing data collection systems
B: Number and types of metering points
C: Duration and accuracy of metering activities
D: Performance risk

参考答案: D

本题解释:
Notes:
Reference: Energy and Atmosphere Credit, Measurement and Verification, Benefits, Economic
Issues
The performance risk is an estimate of the system performance over time. This cost is not an
upfront cost.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-26 22:20 , Processed in 0.153424 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部