LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 160|回复: 0
打印 上一主题 下一主题

Which factor is used in the calculation of Materials and Resources Credit, Rapid

[复制链接]

1759

主题

1

好友

5674

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-8-12 17:44:24 |只看该作者 |倒序浏览
试卷: LEED v4 ID+C模拟题A卷英文[查看]
Which factor is used in the calculation of Materials and Resources Credit, Rapidly Renewable Materials?
A: Volume
B: Weight
C: Cost
D: Area

参考答案: C

本题解释:
Notes:

Reference: Materials and Resources Credit, Rapidly Renewable Materials, Requirements

The percent of Rapidly Renewable Materials used on a project are determined by the cost of the rapidly renewable materials purchased compared to the total materials cost.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-26 10:50 , Processed in 0.079734 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部