- 注册时间
- 2012-6-6
- 最后登录
- 2024-12-11
- 阅读权限
- 200
- 积分
- 5674
- 精华
- 3
- 帖子
- 1765
|
试卷: LEED AP BD+C模拟题A[查看] A new school project will have 1,000 students from grades 4-8 and 75 FTE staff. What must the
project have to earn Sustainable Sites Credit, Alternative Transportation-Bicycle Storage and
Changing Rooms?(choose 2) A: 5 shower and changing facilities B: Dedicated bike lanes that extend at least to the end of the school property in 2 or more directions C: 54 secure bicycle racks and/or storage D: 4 shower and changing facilities 参考答案: BC
本题解释: Notes:
Reference: Sustainable Sites Credit, Alternative Transportation-Bicycle Storage and Changing
Rooms, Requirements
For school projects, dedicated bike lanes that extend at least to the end of the school property in 2
or more directions are required
To calculate the number of secure bicycle spaces, multiply the total FTE staff occupants, peak
transients, and students by 0.05. In this example it was 1075 X 0.05 = 53.75 = 54 rounded up.
Showers are needed for FTE staff only. In this example it would be 75 FTE X 0.005 = 0.375 = 1
rounded up. |
|