LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 300|回复: 0
打印 上一主题 下一主题

The project team for a new elementary school wants to ensure that they will rece

[复制链接]

1759

主题

1

好友

5684

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-8-12 16:22:18 |只看该作者 |倒序浏览
试卷: LEED AP BD+C模拟题A[查看]
The project team for a new elementary school wants to ensure that they will receive a LEED Gold
certification rating. The project team is discussing what additional credits may be attempted to
achieve LEED Gold certification. What criteria must be met to use the school as a teaching tool to
earn an Innovation in Design credit?
A: Students must be included in the design of the curriculum
B: Provides 8 or more hours of classroom instruction
C: Meets USGBC curriculum standards
D: Approved by school administrators

参考答案: D

本题解释:
Notes:
Reference: Innovation in Design Credit, The School as a Teaching Tool, Requirements
The curriculum must be approved by the school administrators..
The curriculum must meet local or state standards. There are no USGBC curriculum standards.
The curriculum must be implemented within 10 months after LEED certification, and provide 10
or more hours of classroom instruction per year, per full-time student.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-4-29 01:21 , Processed in 0.072767 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部