试卷: LEED AP BD+C模拟题A[查看] A CxA has been selected who is a subcontractor of the general contractor with construction
responsibilities. What tasks does the CxA not need to perform for fundamental commissioning? A: Complete a summary commissioning report B: Review the basis of design C: Develop and incorporate commissioning requirements into the construction documents D: Develop a systems manual 参考答案: D
本题解释: Notes:
Reference: Energy and Atmosphere Prerequisite, Fundamental Commissioning of Building Energy
Systems , Requirements
There are six activities that must be completed by the project team for Fundamental
Commissioning.
1. Designate an individual as the commissioning authority (CxA) to lead, review and oversee the
completion of the commissioning process activities.
2. The owner must document the owner\'s project requirements. The design team must develop the
basis of design. The CxA must review these documents for clarity and completeness. The owner
and design team must be responsible for updates to their respective documents.
3. Develop and incorporate commissioning requirements into the construction documents.
4. Develop and implement a commissioning plan.
5. Verify the installation and performance of the systems to be commissioned.
6. Complete a summary commissioning report.
A systems manual is part of Enhanced Commissioning, not Fundamental Commissioning. |
|