- 注册时间
- 2012-6-6
- 最后登录
- 2025-4-16
- 阅读权限
- 200
- 积分
- 5680
- 精华
- 3
- 帖子
- 1765
  
|
试卷: LEED AP ID+C 模拟试卷D[查看] Which project areas do not have to be commissioned as part of the certification for an office project?(choose 2) A: Pressurization of any smoking rooms B: Daylighting controls C: Building insulation D: Passive ventilation system E: Solar panels 参考答案: AC
本题解释: Notes:
At a minimum, certain systems must be commissioned for Energy and Atmosphere Prerequisite, Fundamental Commissioning of Building Energy Systems. These systems include:
- Heating, ventilation, air conditioning, and HVAC
- Lighting & daylighting controls
- Domestic hot water systems
- Renewable energy systems (wind, solar, etc.)
Passive ventilation is synoymous with natural ventilation. |
|