LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 165|回复: 0
打印 上一主题 下一主题

A project site is 75% developed. The project team wants to improve the stormwate

[复制链接]

1759

主题

1

好友

5674

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-8-4 18:36:12 |只看该作者 |倒序浏览
试卷: LEED AP ID+C 模拟试卷D[查看]
A project site is 75% developed. The project team wants to improve the stormwater performance from the pre-development runoff rate. What must occur with the stormwater to achieve 1 point?
A: Post-development rate and quantity must be 25% less than the pre-development rate and quantity
B: Post-development rate and quantity must not exceed the pre-development rate and quantity
C: Post-development quantity must be 50% less than the pre-development quantity only
D: Implement best management practices for 80% of the post-development rate and quantity

参考答案: A

本题解释:
Notes:

There are two compliance paths for Stormwater Quantity Control - largely undeveloped sites (< = 50%) and largely developed sites (51%+.) The question stated the site was 75% developed: thus, Option 2 requirements must be met. For Option 2 the post-development rate and quantity must be 25% less than the pre-development rate and quantity.

For Option 1 (largely undeveloped sites) the pre and post rate/quantity must be equal.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-23 23:32 , Processed in 0.079712 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部