A project team has not done a Design Energy Cost calculation. For Green Power, w

[复制链接]

1759

主题

1

好友

5674

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-8-4 18:33:34 |只看该作者 |倒序浏览
试卷: LEED AP ID+C 模拟试卷D[查看]
A project team has not done a Design Energy Cost calculation. For Green Power, what can be used to determine the amount of green power to be contracted?(choose 2)
A: EPA Energy Guide by Metro Area
B: Actual electricity consumption based on the prior 12 months of data
C: US DOE 2003 Commercial Sector Average Energy Costs by State
D: Commercial Buildings Energy Consumption Survey

参考答案: BD

本题解释:
Notes:

See EA Credit 4 Calculations

If the project team did not do a Design Energy Cost calculation as part of EA Credit 1.3, the actual electricity consumption can be used (if a full year\'s consumption is available) or alternatively the CBECS database can be used.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-23 22:16 , Processed in 0.074739 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部