- 注册时间
- 2012-6-6
- 最后登录
- 2024-12-11
- 阅读权限
- 200
- 积分
- 5674
- 精华
- 3
- 帖子
- 1765
|
试卷: LEED AP ID+C 模拟试卷D[查看] A general contractor is working on documenting the quantity of materials reuse for a project. If a salvaged material came from on-site, how will the contractor determine the replacement value of the material? A: Using a comparable material in the local market, excluding labor and shipping B: An estimate based on the contractor’s knowledge of material prices C: Using a comparable material in the local market, including labor and shipping D: Using a comparable material in the local market and multiplying it by 45% 参考答案: A
本题解释: Notes:
Reference: Materials and Resources Credit, Materials Reuse, Calculations
Material reuse is based on the total cost of the materials and the total cost of any reused/salvaged materials.
If a salvaged material came from on-site, the replacement value of the material is determined by comparing the material to something available in the local market. Any discounts the seller may apply is excluded. |
|