LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 527|回复: 0
打印 上一主题 下一主题

What measures could be taken to achieve 40% treatment of a site area\\\'s total

[复制链接]

262

主题

0

好友

33

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-8-4 17:13:07 |只看该作者 |倒序浏览
试卷: LEED AP ID+C 模拟试卷C[查看]
What measures could be taken to achieve 40% treatment of a site area’s total phosphorous?

A: Removing all bioswales from parking lots
B: Adding a constructed wetland
C: Installing high albedo surfaces in the parking lot
D: Planting trees to provide cover for hardscapes

参考答案: B

本题解释:
This question refers to Sustainable Site Credit, Site Selection Option 2 Path 3: Stormwater Design - Quality Control

This credit requires the demonstration of reduction of Total Suspended Solids (TSS) and Total Phosphorus (TP)

A wetland, even one that is constructed, will help filtrate stormwater.

Trees are not a measure that is specified by LEED to treat storm water.

Bioswales should be added to parking lots, not removed.

The reflectivity of a surface does not impact stormwater.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-23 14:02 , Processed in 0.078357 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部