LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 581|回复: 0
打印 上一主题 下一主题

In the design phase a project team has selected energy-efficient equipment and a

[复制链接]

1759

主题

1

好友

5674

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-7-29 14:38:06 |只看该作者 |倒序浏览
试卷: LEED AP ID+C 模拟试卷A[查看]
In the design phase a project team has selected energy-efficient equipment and appliances that will earn 2 points for Energy and Atmosphere Credit, Optimize Energy Performance-Equipment and Appliances. What should the project team do prior to purchasing the equipment? (choose 2)
A: Consult with the lighting designer to include any lighting products in the calculations
B: Review the ENERGY STAR website for updates to product categories and models
C: Consult CIRs to determine any differences in the rated power that must be used in the calculations
D: Determine if any building envelope products can be included in the credit calculations

参考答案: BC

本题解释:
Reference: Energy and Atmosphere Credit, Optimize Energy Performance-Equipment and Appliances, Imple

Review the latest CIRs and ENERGY STAR criteria for the equipment (pg 180, paragraph 3, last sentence).

Building envelope and lighting products do not qualify for this credit.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-23 10:45 , Processed in 0.073645 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部