For a new project, it is hoped that water management can be carried out by tracking water consumption and more opportunities for water saving can be found.Which of the following water subsystems is recommended to install water meters
A: Metering of water system supplying 30% of landscape irrigation area
B: Measure the water consumption of at least 50% of the installed domestic hot water heating facilities
C: Boilers with an estimated total annual water consumption of 50000 gals or more
D: Reclaimed water

参考答案: D
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-27 12:49 , Processed in 0.074325 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部