LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 241|回复: 0
打印 上一主题 下一主题

A project team is reviewing strategies for retaining stormwater on site for a pr

[复制链接]

1759

主题

1

好友

5674

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-8-12 16:22:18 |只看该作者 |正序浏览
试卷: LEED AP BD+C模拟题A[查看]
A project team is reviewing strategies for retaining stormwater on site for a project that will have a
large amount of open space with turf grass. Which strategies will help with retaining stormwater
on-site?(choose 3)
A: Installing cisterns to capture stormwater for irrigation
B: Building a constructed wetland
C: Placing mulch around the areas of turf grass
D: Installing bioswales
E: Increasing the efficiency of the irrigation system

参考答案: ABD

本题解释:
Notes:
Reference: Sustainable Sites Credit, Stormwater Design-Quantity Control, Examples
Keeping stormwater onsite can be done with ponds, wetlands, retention ponds, vegetated filter
strips, rain gardens, storing the water onsite for later use, etc.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-26 10:56 , Processed in 0.082412 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部