试卷: LEED AP ID+C 模拟试卷D[查看]
Which project areas do not have to be commissioned as part of the certification for an office project?(choose 2)
A: Pressurization of any smoking rooms
B: Daylighting controls
C: Building insulation
D: Passive ventilation system
E: Solar panels

参考答案: AC

本题解释:
Notes:

At a minimum, certain systems must be commissioned for Energy and Atmosphere Prerequisite, Fundamental Commissioning of Building Energy Systems. These systems include:

- Heating, ventilation, air conditioning, and HVAC
- Lighting & daylighting controls
- Domestic hot water systems
- Renewable energy systems (wind, solar, etc.)

Passive ventilation is synoymous with natural ventilation.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-4-20 15:27 , Processed in 0.075641 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部