What is the primary reason that a LEED project can have higher development costs

[复制链接]

1759

主题

1

好友

5674

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2014-6-6 10:00:58 |只看该作者 |倒序浏览
试卷: LEED v4 GA模拟题A卷[查看]
What is the primary reason that a LEED project can have higher development costs compared to conventional development?

A: Material costs rose
B: Green building goals were not set in the pre-design phase
C: New, green building technologies were used
D: Team members worked together instead of separately

参考答案: B

本题解释:
B:The primary reason that a green or LEED building would be more expensive is that the green building goals were considered an add-on after the design was completed. This approach does not involve an integrative process and usually results in a more expensive building.

The other primary reason is a lack of an integrative design team or team members not communicating and sharing responsibilities. When the left hand doesn\'t talk to the right hand, the process fails-or at least breaks down.

Value engineering some of the green building goals out might cut development costs, but will almost always result in higher operating costs. Consider the removal of an on-site wastewater treatment system, which will lead to lower upfront costs, but higher long-term operating costs.
A:This is not the primary reason.
C:While this can lead to higher costs, it is not the primary reason (based on research).
D:Integrative project teams reduce mistakes and construction costs.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

0

主题

0

好友

36

积分

QQ游客

沙发
发表于 2015-6-17 20:55:28 |只看该作者
I did not get it here. Compared to traditional design-construciton phase, the LEED project has already included the intergrative process, no? That is a huge difference between the conventional&LEED project. But here, the answer is in the perspective of the LEED or the conventional project?
回复

使用道具 举报

0

主题

0

好友

36

积分

QQ游客

板凳
发表于 2015-6-17 20:55:35 |只看该作者
I did not get it here. Compared to traditional design-construciton phase, the LEED project has already included the intergrative process, no? That is a huge difference between the conventional&LEED project. But here, the answer is in the perspective of the LEED or the conventional project?
回复

使用道具 举报

0

主题

0

好友

36

积分

QQ游客

地板
发表于 2015-6-17 20:55:37 |只看该作者
I did not get it here. Compared to traditional design-construciton phase, the LEED project has already included the intergrative process, no? That is a huge difference between the conventional&LEED project. But here, the answer is in the perspective of the LEED or the conventional project?
回复

使用道具 举报

0

主题

0

好友

36

积分

QQ游客

5#
发表于 2015-6-17 20:55:39 |只看该作者
I did not get it here. Compared to traditional design-construciton phase, the LEED project has already included the intergrative process, no? That is a huge difference between the conventional&LEED project. But here, the answer is in the perspective of the LEED or the conventional project?
回复

使用道具 举报

0

主题

0

好友

36

积分

QQ游客

6#
发表于 2015-6-17 20:55:39 |只看该作者
I did not get it here. Compared to traditional design-construciton phase, the LEED project has already included the intergrative process, no? That is a huge difference between the conventional&LEED project. But here, the answer is in the perspective of the LEED or the conventional project?
回复

使用道具 举报

0

主题

0

好友

36

积分

QQ游客

7#
发表于 2015-6-17 20:55:41 |只看该作者
I did not get it here. Compared to traditional design-construciton phase, the LEED project has already included the intergrative process, no? That is a huge difference between the conventional&LEED project. But here, the answer is in the perspective of the LEED or the conventional project?
回复

使用道具 举报

0

主题

0

好友

36

积分

QQ游客

8#
发表于 2015-6-17 20:57:50 |只看该作者
I did not get it here. Compared to traditional design-construciton phase, the LEED project has already included the intergrative process, no? That is a huge difference between the conventional&LEED project. But here, the answer is in the perspective of the LEED or the conventional project?
回复

使用道具 举报

0

主题

0

好友

36

积分

QQ游客

9#
发表于 2015-6-17 20:57:52 |只看该作者
I did not get it here. Compared to traditional design-construciton phase, the LEED project has already included the intergrative process, no? That is a huge difference between the conventional&LEED project. But here, the answer is in the perspective of the LEED or the conventional project?
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-23 09:53 , Processed in 0.082771 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部