- 注册时间
- 2012-6-6
- 最后登录
- 2024-12-11
- 阅读权限
- 200
- 积分
- 5674
- 精华
- 3
- 帖子
- 1765
|
试卷: LEED AP ID+C 模拟试卷A[查看] In the design phase a project team has selected energy-efficient equipment and appliances that will earn 2 points for Energy and Atmosphere Credit, Optimize Energy Performance-Equipment and Appliances. What should the project team do prior to purchasing the equipment? (choose 2) A: Consult with the lighting designer to include any lighting products in the calculations B: Review the ENERGY STAR website for updates to product categories and models C: Consult CIRs to determine any differences in the rated power that must be used in the calculations D: Determine if any building envelope products can be included in the credit calculations 参考答案: BC
本题解释: Reference: Energy and Atmosphere Credit, Optimize Energy Performance-Equipment and Appliances, Imple
Review the latest CIRs and ENERGY STAR criteria for the equipment (pg 180, paragraph 3, last sentence).
Building envelope and lighting products do not qualify for this credit. |
|