- 注册时间
- 2012-6-6
- 最后登录
- 2024-12-11
- 阅读权限
- 200
- 积分
- 5674
- 精华
- 3
- 帖子
- 1765
|
试卷: LEED AP ID+C 模拟试卷D[查看] A project team has not done a Design Energy Cost calculation. For Green Power, what can be used to determine the amount of green power to be contracted?(choose 2)
A: EPA Energy Guide by Metro Area B: Actual electricity consumption based on the prior 12 months of data C: US DOE 2003 Commercial Sector Average Energy Costs by State D: Commercial Buildings Energy Consumption Survey 参考答案: BD
本题解释: Notes:
See EA Credit 4 Calculations
If the project team did not do a Design Energy Cost calculation as part of EA Credit 1.3, the actual electricity consumption can be used (if a full year\'s consumption is available) or alternatively the CBECS database can be used. |
|