A Core and Shell project in Nevada has a wind energy system added to the roof. <

[复制链接]

1759

主题

1

好友

5674

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-8-12 18:42:55 |只看该作者 |倒序浏览
试卷: LEED AP BD+C模拟题B[查看]
A Core and Shell project in Nevada has a wind energy system added to the roof.
According to the US DOE’s Commercial Buildings Energy Consumption Survey the
estimated electricity the project will use will be 1,000,000 kWh/year. Energy costs in the
area are $0.08/kWh. What must the wind system produce to earn 4 points for Energy and
Atmosphere Credit, On-Site Renewable Energy?
A: $8,000 of energy
B: 10,000 kWh of energy
C: 20,000 kWh of energy
D: $800 of energy

参考答案: D

本题解释:
Notes:
To earn four points, a Core and Shell project must get 1% of the buildings annual energy cost
from on-site renewable energy.
On-site renewable energy is calculated as a percent of the building\'s annual energy cost. The
correct answer is 1% of the cost, not 1% of the total energy.
The estimated energy use is 1,000,000 kWh from the CBECS database. This multiplied by the
cost per kilowatt hour gives an annual energy cost of $80,000.
$80,000 X 1% (0.01) = $800.00
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-27 12:27 , Processed in 0.076060 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部