- 注册时间
- 2012-6-6
- 最后登录
- 2024-12-11
- 阅读权限
- 200
- 积分
- 5674
- 精华
- 3
- 帖子
- 1765
|
试卷: LEED AP BD+C模拟题A[查看] During an early design review, a project team has decided to consolidate the building footprint and
add underground parking. These changes can contribute to earning which credits(choose 2) A: Sustainable Sites Credit, Stormwater Design-Quantity Control B: Sustainable Sites Credit, Heat Island Effect-Nonroof C: Water Efficiency Prerequisite, Water Use Reduction D: Sustainable Sites Credit, Alternative Transportation-Parking Capacity 参考答案: AB
本题解释: Notes:
Stormwater runoff volumes can be reduced by consolidating the building footprint and designing
the building with underground parking. This strategy also reduces heat island effects.
Changing the building footprint and where parking is located does not necessarily mean that total
parking capacity will change. |
|