A contractor is planning for an occupied flush-out to reduce IAQ problems from the construction
of a new wing in an office. The contractor introduces 3,500 cubic feet of outdoor air per square
foot of floor area 3 hours prior to the first occupants arriving. What will need to be done next to
achieve Indoor Environmental Quality Credit, Construction Indoor Air Quality Management
Plan-Before Occupancy?
A: Flush out the space with 3,500 cubic feet of outside air per square foot of floor area each day for a period of 7 days
B: Nothing, the flush-out is complete
C: Conduct a baseline IAQ test
D: Continue the flushout until a total of 14,000 cubic feet per square foot of outside air has been delivered to the space

参考答案: D

本题解释:
Notes:
Reference: Indoor Environmental Quality Credit, Construction Indoor Air Quality Management
Plan-Before Occupancy
For an occupied flush-out 3,500 cu. ft. air / sq. ft. must be used prior to occupancy. Ventilation
must begin at least 3 hours prior to occupancy until a total of 14,000 cu. ft. air / sq. ft. of air has
been introduced.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-4-21 08:07 , Processed in 0.079312 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部