LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 310|回复: 0
打印 上一主题 下一主题

After the design phase of a school project the team decided to replace outdoor b

[复制链接]

1759

主题

1

好友

5674

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-8-12 16:22:18 |只看该作者 |倒序浏览
试卷: LEED AP BD+C模拟题A[查看]
After the design phase of a school project the team decided to replace outdoor basketball courts
with an athletic field covered in turf grass. What statement is true regarding this design change?
A: The field may be included in Water Efficient Landscaping calculations
B: The field would not contribute to joint use of facilities
C: The field will require curfew timers for the lighting that shutoff no later than 10 p.m.
D: The field will not contribute to maximizing open space

参考答案: A

本题解释:
Notes:


Reference: Water Efficiency Credit, Water-Efficient Landscaping, Implementation, Technologies


For school projects the playing fields can be included in the water calculations at the project teams
discretion. They are not required.


The field could be used for joint-use.


Curfew timers must turn off no later than 11 p.m., not 10 p.m.


Playing fields can contribute to open space
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-26 10:33 , Processed in 0.076346 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部