试卷: LEED AP BD+C模拟题A[查看]
The project scope for a new building has changed to include graywater for non-potable
applications and native plants for landscaping. What credit would this change not affect?
A: Water Efficiency Credit, Innovative Wastewater Technologies
B: Water Efficiency Credit, Water-Efficient Landscaping
C: Water Efficiency Credit, Water Use Reduction
D: Sustainable Sites Credit, Site Development-Maximize Open Space

参考答案: D

本题解释:
Notes:
The intent of Sustainable Sites Credit, Site Development-Maximize Open Space is to provide a
high ratio of open space. Neither graywater nor native plants achieves this goal.
Graywater can be used for irrigation to achieve Water Efficiency Credit, Water-Efficient
Landscaping.
Graywater contributes to reducing potable water use of a building for Water Efficiency Credit,
Innovative Wastewater Technologies.
Graywater collection and storage can be a water use reduction for Water Efficiency Credit, Water
Use Reduction.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-26 10:17 , Processed in 0.076874 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部