- 注册时间
- 2012-6-6
- 最后登录
- 2024-12-11
- 阅读权限
- 200
- 积分
- 5674
- 精华
- 3
- 帖子
- 1765
|
试卷: LEED AP BD+C模拟题A[查看] The project scope for a new building has changed to include graywater for non-potable
applications and native plants for landscaping. What credit would this change not affect? A: Water Efficiency Credit, Innovative Wastewater Technologies B: Water Efficiency Credit, Water-Efficient Landscaping C: Water Efficiency Credit, Water Use Reduction D: Sustainable Sites Credit, Site Development-Maximize Open Space 参考答案: D
本题解释: Notes:
The intent of Sustainable Sites Credit, Site Development-Maximize Open Space is to provide a
high ratio of open space. Neither graywater nor native plants achieves this goal.
Graywater can be used for irrigation to achieve Water Efficiency Credit, Water-Efficient
Landscaping.
Graywater contributes to reducing potable water use of a building for Water Efficiency Credit,
Innovative Wastewater Technologies.
Graywater collection and storage can be a water use reduction for Water Efficiency Credit, Water
Use Reduction. |
|