A contractor is preparing to perform a flush-out. The flush-out will occur while the building is unoccupied. What quantity of outside air must be introduced to the project space per sq. ft. of floor area?
A: 10,000 cu. ft.
B: 18,000 cu. ft.
C: 16,000 cu. ft
D: 14,000 cu. ft.

参考答案: D

本题解释:
Reference: Indoor Environmental Quality Credit, Construction Indoor Air Quality Management Plan-Befo

For non-occupied flush-outs 14,000 cu. ft. of outdoor air per square foot of floor area must be used.

When an occupied flush-out is desired, 3,500 ft. of outside air per square foot of floor area must be introduced before occupants can enter the building. The flush-out must continue until 14,000 cu. ft. of outdoor air per square foot of floor area is introduced.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-4-21 04:11 , Processed in 0.076991 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部