A project team working on a project is attempting to divert construction waste f

[复制链接]

1759

主题

1

好友

5680

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-10-7 22:53:11 |只看该作者 |倒序浏览
试卷: LEED v4 ID+C模拟题D卷英文[查看]
A project team working on a project is attempting to divert construction waste from the landfill. Total construction waste is estimated to be 120 yards. What is the minimum material volume and diversion streams that need to be diverted to earn Materials and Resources Credit Construction and Demolition Waste Management?
A: 90 yards from at least 4 material streams
B: 90 yards from at least 3 material streams
C: 60 yards from at least 3 material streams
D: 60 yards from at least 4 material streams

参考答案: C

本题解释:
选择C,本题解释Divert 50% and 3 material streams for Option 1 Diversion, Path 1.
Divert 75% and 4 material streams for Option 1 Diversion, Path 2.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-4-20 04:28 , Processed in 0.082544 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部