LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 127|回复: 0
打印 上一主题 下一主题

Which first step must all projects take before attempting EA Prerequisite Minimu

[复制链接]

1759

主题

1

好友

5674

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-9-22 11:13:49 |只看该作者 |倒序浏览
试卷: LEED v4 ID+C模拟题A卷英文[查看]
Which first step must all projects take before attempting EA Prerequisite Minimum Energy Performance?
A: Review the mandatory components of ASHRAE 90.1
B: Determine if the project will be doing envelope commissioning
C: Create a baseline energy model
D: Determine the project\'s climate zone

参考答案: D

本题解释:
Notes: A :This is Step 2 of the process. B:This is not part of the prerequisite process. C: This occurs later for a whole-building energy simulation. D: The climate zone determines which mandatory requirements from ASHRAE need to be followed, regardless of if an energy model or prescriptive compliance is pursued.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-26 17:38 , Processed in 0.075223 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部