A project team believes they can generate less than 2.5 pounds of construction waste per square foot (12.2 kg/m2) by using source reduction strategies such as modular components and prefabricated wall assemblies for the project. What will the project team need to document for MR Credit Construction and Demolition Waste Management Option 2 Reduction of Total Waste Material?
A: MR Construction and Demolition Waste Management calculator
B: Recycling rates for comingled facilities
C: Total waste per area
D: A 24-hour waste stream audit of the project\'s top five recyclable waste streams

参考答案: C

本题解释:
Note :A :This is required for Option 1 of the credit. B: This is required for Option 1 of the credit. C :Project teams choosing Option 2 need to use source reduction strategies to reduce the quantity of waste generated on site.The required documentation is the total waste per area. D: This is required for retail projects as part of MR Prerequisite Storage and Collection of Recyclables.

分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-25 03:54 , Processed in 0.074633 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部