LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 147|回复: 0
打印 上一主题 下一主题

An office space is being built out in a Core & Shell building. The project will

[复制链接]

262

主题

0

好友

33

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-8-4 18:35:43 |只看该作者 |倒序浏览
试卷: LEED AP ID+C 模拟试卷C[查看]
An office space is being built out in a Core & Shell building. The project will have both open offices and private offices. What can a project implement to earn 5 points for Energy and Atmosphere Credit, Optimize Energy Performance-HVAC? (choose 3)
A: Supply at least 0.20 cf minute/sf of air per standard VAV terminal
B: Installing separate control zones for every solar exposure
C: Separately zoning each interior space
D: Install active controls in the private offices
E: Install manual diffusers at each duct

参考答案: BCD

本题解释:
Reference: Energy and Atmosphere Credit, Optimize Energy Performance-HVAC, Requirements

This question\'s answers are listed in Option 1

Equipment Efficiency - Comply with New Building Institute\\\\\\\\\\\\\\\'s Advanced Buildings Core Performance Guide

Appropriate Zoning and Controls

- Every solar exposure must have a seperate control.
- Interior spaces must be separate control zone
- Private offices and special occupancies must have active controls...

分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-24 03:54 , Processed in 0.075458 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部