- 注册时间
- 2012-6-28
- 最后登录
- 2012-12-19
- 阅读权限
- 200
- 积分
- 33
- 精华
- 0
- 帖子
- 264
|
试卷: LEED AP ID+C 模拟试卷C[查看] An office space is being built out in a Core & Shell building. The project will have both open offices and private offices. What can a project implement to earn 5 points for Energy and Atmosphere Credit, Optimize Energy Performance-HVAC? (choose 3) A: Supply at least 0.20 cf minute/sf of air per standard VAV terminal B: Installing separate control zones for every solar exposure C: Separately zoning each interior space D: Install active controls in the private offices E: Install manual diffusers at each duct 参考答案: BCD
本题解释: Reference: Energy and Atmosphere Credit, Optimize Energy Performance-HVAC, Requirements
This question\'s answers are listed in Option 1
Equipment Efficiency - Comply with New Building Institute\\\\\\\\\\\\\\\'s Advanced Buildings Core Performance Guide
Appropriate Zoning and Controls
- Every solar exposure must have a seperate control.
- Interior spaces must be separate control zone
- Private offices and special occupancies must have active controls...
|
|