- 注册时间
- 2012-6-28
- 最后登录
- 2012-12-19
- 阅读权限
- 200
- 积分
- 33
- 精华
- 0
- 帖子
- 264
|
试卷: LEED AP ID+C 模拟试卷C[查看] A project design will provide an optimal working environment for employees. Among numerous green building strategies implemented for the project, the design team will include:
- Operable windows
- Task/ambient lighting
- Private offices with glass doors and walls adjacent to the building core
- Open office areas near the perimeter wall
- Photocell lighting controls
These design strategies may help this project achieve which credits?(choose 3)
A: Energy and Atmosphere Credit, Optimize Energy Performance-Lighting Power B: Indoor Environmental Quality Credit, Outdoor Air Delivery Monitoring C: Indoor Environmental Quality Credit, Daylight and Views-Daylight D: Indoor Environmental Quality Credit, Indoor Chemical and Pollutant Source Control E: Indoor Environmental Quality Credit, Controllability of Systems-Lighting 参考答案: ACE
本题解释: \\\'Task/ambient lighting\\\' helps achieve Indoor Environmental Quality, Controllability of Systems - Lighting
\\\'Task/ambient lighting\\\' and/or \\\'Photocell lighting controls\\\' helps achieve Indoor Environmental Quality Credit, Controllability of Systems-Lighting.
\\\'Photocell lighting controls\\\' are a potential technology and strategy for Indoor Environmental Quality Credit, Daylight and Views-Daylight.
Proper control systems and daylighting can produce lower operating costs and lower electricity usage to help achieve Energy and Atmosphere Credit, Optimize Energy Performance-Lighting Power. |
|