A project building does not have a way to modulate the HVAC system in response to space demand. What minimum supply volumes for a fan-powered (VAV) box would meet the criteria equipment efficiency and zoning controls?
A: 30% below the peak design flow rate
B: 22.5% below the peak design flow rate
C: 20% below the peak design flow rate
D: 15% below the peak design flow rate
E: 10% below the peak design flow rate

参考答案: B

本题解释:
背下来
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-23 14:31 , Processed in 0.078606 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部