LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 347|回复: 0
打印 上一主题 下一主题

A corporate headquarters will have space for 600 occupants when the building is

[复制链接]

1759

主题

1

好友

5674

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-7-29 14:38:06 |只看该作者 |倒序浏览
试卷: LEED AP ID+C 模拟试卷A[查看]
A corporate headquarters will have space for 600 occupants when the building is complete. The building will use natural ventilation. What design decision would not help the project earn both Indoor Environmental Quality Credit, Controllability of Systems, Lighting and Thermal Comfort?
A: Provide individual task lighting for 540 of the occupants
B: Provide comfort system controls for all densely occupied spaces
C: Install operable windows and locate at least 300 occupants 20 feet inside and 10 feet to either side of the windows
D: Provide lighting controls for all training and conference rooms

参考答案: B

本题解释:
Note the question contains the word NOT and is requesting the answers that will not help earn BOTH credits.

Densely occupied spaces are not part of Controllability of Systems.

For Thermal Comfort individual comfort controls are needed for 50% of the building occupants. In this example that would be 300 occupants. Operable windows are acceptable for this credit for occupants close enough to the windows.

Providing lighting controls for 90% of occupants is required for lighting controls for individual task needs.

Lighting controls are needed for all multi-occupant spaces. Training and conference rooms are multi-occupant spaces.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-23 13:27 , Processed in 0.077894 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部