A contractor is documenting an IAQ management plan. What can a contractor do to achieve Indoor Environmental Quality Credit, Construction Indoor Air Quality Management Plan-Before Occupancy?

A: Meet or exceed SMACNA control measures
B: Replace MERV 8 filters with MERV 13 filters
C: Prohibit smoking in the building and prohibit smoking within 25 feet of the building entrance once the building is enclosed
D: A flush-out air volume of 14,000 cubic feet of outdoor air per sq.ft. of floor area while maintaining an internal temperature

参考答案: D

本题解释:
Reference: Indoor Environmental Quality Credit, Construction Indoor Air Quality Management Plan-Befo

Meeting SMACNA control measures and prohibiting smoking are requirements for During Construction. While smoking still should be prohibited Before Occupancy, the intent is to learn the different requirements of each credit.

The other flush out option, a Phased Flush Out, is not listed as an answer choice.

分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-23 14:44 , Processed in 0.078313 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部