A project has entered the schematic design phase. The architect and owner are identifying nonstructural elements in the building that can be retained and reused. Which building elements must be excluded in the building material calculation for Materials and Resources Credit, Building Reuse-Maintain Interior Nonstructural Components? (choose 2)
A: Recycled rubber flooring
B: Built-in case goods
C: Exterior windows
D: Exterior and party walls
E: Exterior doors

参考答案: CE

本题解释:
See Materials and Resources Credit, Building Reuse-Maintain Interior Nonstructural Components, Calculations, Table 1

The calculations include non-structural elements. The question asks what would be excluded from the calculations.

Exterior windows and doors must be excluded from the calculations.

Exterior and party walls can be included. Include only 1 side.
Built-in case good and flooring would be interior non-structural elements and would be included in the calculation.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-28 05:01 , Processed in 0.078055 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部