What must a project team do prior to phasing out CFC-based refrigerants?
A: Select a replacement refrigerant with a long atmospheric lifetime
B: Select a replacement refrigerant with a nonzero Ozone Depletion Potential (ODP)
C: Vent any remaining CFCs for disposal to the air prior to decommissioning any equipment
D: Reduce the annual leakage of CFCs to 5% or less using EPA Clean Air Act procedures

参考答案: D

本题解释:
Notes:

Reference: LEED 2009 for New Construction and Major Renovations Rating System

Refrigerants should be selected with short atmospheric lifetimes, not long atmospheric lifetimes.
Refrigerants that are best for the environment have zero ODP. LEED doesn\'t require selecting refrigerants with zero ODP, but suggests refrigerants be chosen that have low/no ODP.

Venting the CFCs to the air is what you don\'t want to do. CFCs in the atmosphere are what cause ozone depletion.

The question asks what must the project team do.

Before the phase-out begins, LEED requires reducing the annual leakage of CFCs to 5% or less using EPA Clean Air Act procedures.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享1 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-27 11:37 , Processed in 0.074669 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部