A renovation project will incorporate an existing building but will not meet the requirements
for Materials and Resources Credit, Building Reuse-Maintain Existing Walls, Floors, and Roof. The reused portions of the existing building can be applied to which credits?(choose 2)
A: Materials and Resources Credit, Building Reuse-Maintain Interior Nonstructural Elements
B: Materials and Resources Credit, Construction Waste Management
C: Materials and Resources Credit, Certified Wood
D: Materials and Resources Credit, Materials Reuse

参考答案: BD

本题解释:
Notes:
\'Projects that are incorporating existing buildings but do not meet the requirements for
Building Reuse may apply the reused portions of the existing buildings towards the
achievement of Construction Waste Management.
If items for reuse are used for another purpose (i.e, doors made into tables), they
contribute to earning Materials Reuse credit.
See MR Credit 1. Related Credits and Implementation
\'Projects that incorporate part of an existing building but do not meet the requirements for
MR Credit 1 may apply the reused portion to MR Credit 2...\'
Salvaged or refurbished material could also be used in ways to apply to MR Credit 3
Materials Reuse.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-4-21 07:25 , Processed in 0.074583 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部