- 注册时间
- 2012-6-6
- 最后登录
- 2024-12-11
- 阅读权限
- 200
- 积分
- 5674
- 精华
- 3
- 帖子
- 1765
|
试卷: LEED AP BD+C模拟题B[查看] A project will include collecting all stormwater from the roof of the building and using the
water for irrigation. What will need to be done prior to collecting and reusing stormwater? A: Consulting local authorities to determine BMPs B: Contouring the landscape C: Installing pervious paving D: Determining the chemicals to be used for treatment 参考答案: A
本题解释: Notes:
Reference: Sustainable Sites Credit, Stormwater Design-Quantity Control, Implementation,
Harvesting
The local government may regulate stormwater use; check with authorities prior to engaging in
any collection plans. |
|