试卷: LEED AP ID+C 模拟试卷C[查看] A contractor is planning for an occupied flush-out to reduce IAQ problems from the construction of a new wing in an office. The contractor introduces 3,500 cubic feet of outdoor air per square foot of floor area 3 hours prior to the first occupants arriving. What will need to be done next to achieve Indoor Environmental Quality Credit, Construction Indoor Air Quality Management Plan-Before Occupancy?
A: Continue the flushout until a total of 14,000 cubic feet per square foot of outside air has been delivered to the space B: Nothing, the flush-out is complete C: Conduct a baseline IAQ test D: Flush out the space with 3,500 cubic feet of outside air per square foot of floor area each day for a period of 7 days 参考答案: A
本题解释: Reference: Indoor Environmental Quality Credit, Construction Indoor Air Quality Management Plan-Befo
For an occupied flush-out 3,500 cu. ft. air / sq. ft. must be used prior to occupancy. Ventilation must begin at least 3 hours prior to occupancy until a total of 14,000 cu. ft. air / sq. ft. of air has been introduced.
|
|