A previously developed site has been selected for a new bank. Part of the site will be restored with
native plants. Which of the following stabilization strategies would help control erosion and
reduce potable water use for irrigation?
A: Connecting impervious areas
B: Rain garden
C: Mulching
D: Permanent seeding

参考答案: C

本题解释:
Notes:
Reference: Sustainable Sites Prerequisite, Construction Activity Pollution Prevention,Implementation


This prerequisite lists the following stabilization control strategies:

- temporary/permanent seeding

-mulching


Only mulching is a stabilization control that helps control erosion and sedimentation, as well as
reduce potable water use for irrigation.


A rain garden is a non-structural strategy to improve stormwater quantity/quality.

Impervious areas should be DISconnected to help improve stormwater quality, not connected.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-4-21 04:00 , Processed in 0.086758 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部