试卷: LEED AP BD+C模拟题A[查看] A contractor is planning for an occupied flush-out to reduce IAQ problems from the construction
of a new wing in an office. The contractor introduces 3,500 cubic feet of outdoor air per square
foot of floor area 3 hours prior to the first occupants arriving. What will need to be done next to
achieve Indoor Environmental Quality Credit, Construction Indoor Air Quality Management
Plan-Before Occupancy? A: Flush out the space with 3,500 cubic feet of outside air per square foot of floor area each day for a period of 7 days B: Nothing, the flush-out is complete C: Conduct a baseline IAQ test D: Continue the flushout until a total of 14,000 cubic feet per square foot of outside air has been delivered to the space 参考答案: D
本题解释: Notes:
Reference: Indoor Environmental Quality Credit, Construction Indoor Air Quality Management
Plan-Before Occupancy
For an occupied flush-out 3,500 cu. ft. air / sq. ft. must be used prior to occupancy. Ventilation
must begin at least 3 hours prior to occupancy until a total of 14,000 cu. ft. air / sq. ft. of air has
been introduced. |
|