- 注册时间
- 2012-6-6
- 最后登录
- 2024-12-11
- 阅读权限
- 200
- 积分
- 5674
- 精华
- 3
- 帖子
- 1765
|
试卷: LEED AP ID+C 模拟试卷D[查看] When should a project team choose the performance rating method for Energy and Atmosphere Credit, Optimize Energy Performance-HVAC? A: When the project will have tradeoffs in energy performance between building systems B: When the building is 100% owner occupied C: When the project has an unconventional HVAC system D: When the building is 5-stories or more 参考答案: C
本题解释: Notes:
Reference: Energy and Atmosphere Credit, Optimize Energy Performance-HVAC, Calculations, Option 2
If the project has an unconventional HVAC system the performance rating method, which is more comprehensive, should be used. |
|