LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 200|回复: 0
打印 上一主题 下一主题

Which of the following are NOT soft costs?

[复制链接]

203

主题

0

好友

512

积分

超级版主

Rank: 8Rank: 8

跳转到指定楼层
楼主
发表于 2012-8-10 09:04:58 |只看该作者 |正序浏览
试卷: LEED GA模拟题A[查看]
Which of the following are NOT soft costs?
A: Commissioning of the building”s systems
B: Project drawings
C: Windows
D: City permits

参考答案: C

本题解释:
This is a soft cost.

Commissioning is systematic process of assuring that a building and its systems performs in accordance with the design intent and the owner\\\'s requirements;This is a soft cost; This is a hard cost. By far the largest portion of the expenses in a construction budget, the hard costs are mostly comprised of the actual construction costs incurred to build the project.

Examples of hard costs include masonry, wood, steel, carpet, tile, mechanical systems, roofing;This is a soft cost
Notes:



A soft construction cost is one that is not directly related to building, construction, etc. These include building permit fees, architect fees, legal, financing, engineering fees, commissioning, and other costs incurred before and after construction
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-25 11:19 , Processed in 0.086435 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部