LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 367|回复: 0
打印 上一主题 下一主题

What is a primary reason that a LEED project can have higher development costs c

[复制链接]

203

主题

0

好友

512

积分

超级版主

Rank: 8Rank: 8

跳转到指定楼层
楼主
发表于 2012-8-10 09:04:58 |只看该作者 |正序浏览
试卷: LEED GA模拟题A[查看]
What is a primary reason that a LEED project can have higher development costs compared to conventional development?
A: Rising material costs
B: Team members working together instead of separately
C: New green building technologies were used
D: Green building goals were not set in the pre-design phase

参考答案: D

本题解释:
Rising material costs is not the primary reason;Integrated teams reduce mistakes and construction costs;While this can lead to higher costs, it is not the primary reason (based on research);The primary reason that a green or LEED building would be more expensive is that the green building goals were considered an add-on after the design was completed. This approach does not involve an integrated process and usually results in a more expensive building.

The other primary reason is a lack of an integrated design team or team members not communicating and sharing responsibilities. When the left hand doesn\'t talk to the right hand, the process fails-or at least breaks down.

Value engineering some of the green building goals out might cut development costs, but will almost always result in higher operating costs. Consider the removal of an on-site wastewater treatment system, which will lead to lower upfront costs, but higher long-term operating costs.Reference: Cost of Green Revisited
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏1
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-25 10:55 , Processed in 0.072721 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部