LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 466|回复: 0
打印 上一主题 下一主题

A project team for a retail project is conducting a waste stream study over a 24

[复制链接]

1759

主题

1

好友

5674

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-9-22 11:15:32 |只看该作者 |正序浏览
试卷: LEED v4 ID+C模拟题A卷英文[查看]
A project team for a retail project is conducting a waste stream study over a 24-hour period to track the waste generated. What does the project team need to identify for the audit as part of MR Prerequisite Storage and Collection of Recyclables?
A: All waste streams accepted by a waste hauler
B: The top four recyclable waste streams by volume
C: The top five recyclable waste streams by weight or volume
D: All waste streams that make up more than 10% of the total waste by volume

参考答案: C

本题解释:
Note C: Retail projects must identify the top five recyclable waste streams by either weight or volume.
Based on the study the top four streams must have collection and storage space at the project.

分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-26 18:25 , Processed in 0.079211 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部