下列哪个项目达不到最小程序要求,即不能获得认证?

[复制链接]

1759

主题

1

好友

5674

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2015-3-9 17:49:50 |只看该作者 |正序浏览
试卷: LEED v4 BD+C中文模拟题(A)[查看]
下列哪个项目达不到最小程序要求,即不能获得认证? Which project would not meet the minimum program requirements for certification?
A: 一个半地下的新实验室建筑 A new laboratory building located partially underground
B: 新建建筑在办公园区,比邻建筑是一个已经获得LEED认证的建筑 A new building on an office campus located next door to an existing certified building
C: 模块化教室可以在学校里面从一个地方移到另外一个地方 A modular classroom that can be moved to another location on the school property
D: 建筑与3层楼高 A building project that is three stories high

参考答案: C

本题解释:
正确答案:C
解析:C:结构必须是永久固定的,因此临时的教室不符合要求 Structures must be permanent, so a temporary classroom would not qualify.
A:LEED不限制建筑位于地下 LEED does not prohibit part of the building being underground.
B:新建建筑比邻建筑是认证的建筑或者不是认证的建筑都没有关系 New buildings located next to other buildings,certified or not,are fine.
D:建筑没有最小高度的限制 Buildings do not have to be a minimum height
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

0

主题

0

好友

68

积分

QQ游客

沙发
发表于 2015-4-30 11:23:34 |只看该作者
MPR?
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-23 14:01 , Processed in 0.075543 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部