试卷: LEED v4 GA模拟题B卷[查看] Which mandatory requirements must all LEED rating systems comply with?(Choose 2) A: Credits B: Charrettes C: CIRs D: Minimum Program Requirements (MPRs) E: Prerequisites 参考答案: DE
本题解释: 正确答案:DE
系统解析: Knowledge Domain: LEED Process
LEED rating systems consist of a collection of credit categories, and each credit category consists of a collection of prerequisites and credits. A prerequisite is a mandatory requirement that must be met, and a credit is an optional strategy the project team can elect to pursue in order to earn points toward certification. Prerequisites and credits are specific to a rating system. Minimum Program Requirements (MPRs) define conditions that every LEED rating system must meet. Prerequisites are LEED rating system specific while each of the three MPRs apply to all LEED rating systems. Prerequisites and MPRs earn no points toward certification, but if a single MPR or prerequisite cannot be met, the project will not be certified.
Structure of LEED rating systems [ Reference Guide Introductory and Overview Sections (MPRs; Getting Started > How to use this reference guide): http://www.usgbc.org/guide/bdc ]
|
|