LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 277|回复: 0
打印 上一主题 下一主题

Which building elements do not have to be commissioned as part of LEED certifica

[复制链接]

1759

主题

1

好友

5674

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-8-4 18:35:43 |只看该作者 |正序浏览
试卷: LEED AP ID+C 模拟试卷D[查看]
Which building elements do not have to be commissioned as part of LEED certification?(choose 2)
A: Heated swimming pool
B: Vegetated roof
C: Stormwater systems
D: Solar panels

参考答案: BC

本题解释:
Notes:

At a minimum, certain specific systems must be commissioned for fundamental commissioning. These systems include:

- Heating, ventilation, air conditioning, and HVAC
- Lighting & daylighting controls
- Domestic hot water systems
- Renewable energy systems (wind, solar, etc.)
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-24 00:04 , Processed in 0.072861 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部