LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 629|回复: 0
打印 上一主题 下一主题

How can the project team calculate the materials costs for MR credits?

[复制链接]

1759

主题

1

好友

5678

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-8-3 09:23:20 |只看该作者 |正序浏览
试卷: LEED AP ID+C 模拟试卷A[查看]
How can the project team calculate the materials costs for MR credits?
A: Apply a 45% factor to total costs (excluding labor and equipment) or use actual cost or replacement value for the materials
B: Apply a 45% factor to total costs (including labor and equipment)
C: Apply a 45% factor to total costs (excluding labor and equipment)
D: Use the actual cost or replacement value for the materials

参考答案: D

本题解释:
LEED BD+C allows project teams to apply a 45% factor to total costs (including labor and equipment) to establish a default total materials cost for a project. LEED ID+C does not have a default value, so the actual cost or replacement cost must be used.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-4-6 03:04 , Processed in 0.074234 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部