LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 243|回复: 0
打印 上一主题 下一主题

A project will reuse refurbished steel door hardware obtained off-site from a sa

[复制链接]

1759

主题

1

好友

5674

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-8-3 09:23:20 |只看该作者 |正序浏览
试卷: LEED AP ID+C 模拟试卷A[查看]
A project will reuse refurbished steel door hardware obtained off-site from a salvage yard located 50 miles from the project site. What is true about this design decision?
A: The door hardware can contribute to Materials and Resources Credit, Building Reuse-Maintain Interior Nonstructural Components
B: The hardware costs can be applied to both MR Credit, Materials Reuse and MR Credit, Regional material
C: The replacement cost must be used when calculating the materials cost
D: The hardware costs can be applied to both MR Credit, Materials Reuse and MR Credit,Recycled Material

参考答案: B

本题解释:
Off-site salvaged material can apply to Materials Reuse and Regional Materials. The salvaged material may not apply to both Materials and Resources Credit 3.1 Materials Reuse and MR Credits 1,2,4,6, or 7. How these credits interact is an important concept to remember and understand.

The materials cost will either be the greater of the actual cost or the replacement cost for off-site materials.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-23 14:05 , Processed in 0.077111 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部