A project team is reviewing strategies for retaining stormwater on site for a pr

[复制链接]

262

主题

0

好友

33

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-7-29 22:19:53 |只看该作者 |正序浏览
试卷: LEED AP ID+C 模拟试卷B[查看]
A project team is reviewing strategies for retaining stormwater on site for a project that will have a large amount of open space with turf grass. Which strategies will help with retaining stormwater on-site?(choose 3)
A: Building a constructed wetland
B: Placing mulch around the areas of turf grass
C: Increasing the efficiency of the irrigation system
D: Installing cisterns to capture stormwater for irrigation
E: Installing bioswales

参考答案: ADE

本题解释:
Reference: Sustainable Sites Credit, Site Selection, Stormwater Design-Quantity Control

Keeping stormwater onsite can be done with ponds, wetlands, retention ponds, vegetated filter strips, rain gardens, storing the water onsite for later use, etc.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-23 09:44 , Processed in 0.075750 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部