试卷: LEED GA模拟题F[查看] Which of the following would be classified as a soft construction cost? A: Construction worker labor costs B: Rental of a dumpster C: Civil engineer consulting fee D: Purchase of some steel 参考答案: C
本题解释: Notes:
A:This is a hard cost. By far the largest portion of the expenses in a construction budget, the hard costs are mostly comprised of the actual construction costs incurred to build the project. Examples of hard costs include masonry, wood, steel, carpet, tile, mechanical systems, roofing.
B:This is a hard cost.
C: A soft construction cost is one that is not directly related to building, construction, etc. These can be architectural, legal, financing, engineering fees, commissioning, and other costs incurred before and after construction.
D:This is a hard cost. |
|