LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 188|回复: 0
打印 上一主题 下一主题

LEED requires which of the following to be done in order for a project to earn c

[复制链接]

1759

主题

1

好友

5674

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-8-21 16:19:09 |只看该作者 |正序浏览
试卷: LEED GA模拟题B[查看]
LEED requires which of the following to be done in order for a project to earn certification?(choose 2)
A: Achieve all prerequisites for the rating system
B: Meet the Minimum Program Requirements
C: Achieve at least 50 points
D: Have the project administrator be a LEED AP
E: Include a LEED AP on the project

参考答案: AB

本题解释:
ALL prerequisites must be met for the rating system. If even a single prerequisite cannot be achieved in the rating system being certified under the project cannot earn LEED certification;All Minimum Program Requirements must be met; Projects must achieve at least 40 points (not 50 points) to become LEED Certified;The project administrator does not have to be a LEED AP;No LEED AP is required for project certification.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-12-27 12:10 , Processed in 0.078788 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部